A Jetty Equipment Overhaul
Jetty equipment plays a crucial role in ensuring the smooth, safe, and efficient operation of ship loading and unloading operations. Over time, the mechanical, hydraulic, and structural components of piercing equipment experience wear and tear due to operational loads, marine corrosion, and aging. Therefore, overhauling is necessary as part of a regular maintenance program to restore the equipment to its original factory specifications.
Overhauling is a process of thorough inspection, disassembly, repair, replacement of damaged or worn components, reassembly, and functional testing to ensure the equipment operates safely and reliably.


Introduction
Overhaul Objectives
The objectives of overhauling jetty equipment are :
To select and maintain operational safety.
To reduce the risk of sudden breakdowns.
To extend the service life of equipment.
To meet regulatory requirements and occupational safety standards.
To reduce the risk of accidents and environmental pollution.
To maintain the continuity of terminal or port operations.
Expected Results
There are no product leaks.
The loading arm moves smoothly.
The safety system is functioning normally.
The equipment meets operational standards.
b. Component Disassembly
Swivel joint.
Seals and gaskets.
Bearings.
Hydraulic cylinder.
Control system and sensors.
c. Repair and Replacement
Replacement of seal kits.
Replacement of worn bearings.
Repair or replacement of hydraulic hoses.
Replacement of damaged position sensors.
Repair of the ERS system.
d. Painting and Corrosion Protection
Sandblasting.
Surface preparation.
Primer coating application.
op coat application according to marine environment specifications.
e. Testing
Hydrostatic test.
Leak test.
Functional test.
Emergency release test.
Operational movement test.
a. Structural Inspection
Boom inspection.
Pedestal inspection.
Weld joint inspection.
Corrosion and deformation inspection.
b. Mechanical Inspection
Wire rope.
Hook block.
Drum.
Gearbox.
Slewing bearing.
c. Electrical Inspection
Drive motor.
Control panel.
Limit switch.
Emergency stop.
Grounding system.
d. Component Replacement
Wire rope that has reached its wear limit.
Slewing Bearings.
Brake lining.
Gearbox seal.
Damaged electrical components.
e. Lubrication and Alignment
Lubrication of all grease points.
Gearbox and motor alignment.
Structural bolt tightness inspection.
f. Testing
No Load Test : Test without load to ensure all functions are functioning normally.
Load Test : Test using a load according to certification standards.
g. Functional Test
Hoisting.
Slewing.
Luffing (if available).
Emergency stop.
Expected Results
The crane can operate at its design capacity.
The safety system is operating normally.
There are no abnormal vibrations or noises.
b. Hydraulic System
Hydraulic Cylinder.
Hydraulic hose and Tubing.
Hydraulic Pump.
Control Valve.
Expected Results
The gangway can operate at its design capacity.
The safety system is operating normally.
There are no abnormal vibrations or noises.
a. Structural Inspection
Tower structure.
Platform.
Inclane ladder.
Handrail.
Telescopic Ladder
Bulwalk ladder
Turn Table
c. Testing
Gangway up and down.
Gangway extension and retraction.
Rotation mechanism.
Emergency release test.